DeLacy Footbridge Bridge Drogheda

Structural and maintenance works to De Lacy Bridge, including installation of sliding joints in lower tubes, replacement of balustrade and hanger insulators, localised steel repairs, and full bridge cleaning and repainting. Works included steel cutting and welding, hanger adjustments, scaffold access, and surface preparation with protective coating systems applied to existing specifications, delivered with full safety and environmental controls for river works.