Conwy Bridge

The works comprised vegetation removal, design and erection of a complex suspended scaffold, full encapsulation, guano removal, power wash, metal repair, grit blast, prime and paint with protective coating system, metal and concrete repair, drainage cleaning re pavement surfacing and bird protection.