Our Projects

We are extremely proud of our projects, the work and environment challenges from our clients, and of the role each individual play in helping GABE achieve our objectives.

Sellafield Nuclear Power Station

This comprehensive contract which was completed in August 2012 involved major steel/metal repair works…

View Project

Conwy Bridge

The works comprised vegetation removal, design and erection of a complex suspended scaffold, full…

View Project

UBN93 Limerick

View Project

UBB65 Gormanstown

View Project

OBC406 Cork

Refurbishment of railway bridge over busy city centre street. Road is part residential and…

View Project

OBC119 Portarlignton

Refurbishment of railway station footbridge, erecting scaffold and emasculation the works to protect the…

View Project

OBC79 Kildare

Refurbishment of railway station footbridge, erecting scaffold and emasculation the works to protect the…

View Project

Kent Station Cork

Refurbishment of station platform roofs – replacement of roof timbers, decoration, installing new cladded…

View Project

Cape Clear Island

Relocation of harbour stop logs, stooling the stop logs to provide access and erection…

View Project

Polhollick Bridge

GABE were the principle contractor for the refurbishment of the Listed Structure Harper designed…

View Project

A90 Cramond, Queensferry Road Bridge

Liaison with neighbouring property owners and SEPA, erect temporary access scaffolding to steel support…

View Project

UB 82 Drogheda Viaduct

Our scope of work was to design and provide access scaffold, encapsulate, manually clean,…

View Project

Bridge Painting UBS 413, West Meath

Full access scaffold, shrink wrap encapsulation, protect the ballast and local environment, manually clean,…

View Project

OBA 10 Cloneygowan, West Meath

GABE were contracted to refurbish the protective coating on above bridge in August 2017….

View Project

Dinting Footbridge, Glossop

GABE was directly appointed by Derbyshire County Council to undertake major remedial works

View Project

East Linton Bypass Bridge

GABE was appointed directly by East Lothian Council In June 2012 to undertake major…

View Project

Holborn Viaduct

GABE was appointed by Balfour Beatty in autumn 2012 to undertake the specialist restoration…

View Project

Kessock Road Bridge, Inverness

GABE was appointed by Balfour Beatty on behalf of the Highlands Council in February…

View Project

Blackpool Rd Deepdale Mill St Bridges

This project was the refurbishment of two roads over railway bridges in Preston Lancashire…

View Project

Port of Dover, Cruise Terminal 1

The structural works included the removal and replacement of 11 000msq steel and glass…

View Project

Loopline Bridge, Dublin

GABE carried out this project direct for Iarnród Éireann during 2011 and the scope…

View Project

Restoration of Thames River Wall

GABE was appointed directly by the Greater London Authority in March 2012 to undertake…

View Project

Time Capsule Activity Centre

GABE was the principle contractor for the refurbishment of the Timecapsule in Coatbridge North…

View Project

UB150 Grey Stones Wicklow Bridge

Principal Contractor for the refurbishment of the UB150 Greystone Bridge over Victoria Road Greystones…

View Project

UB155 Carrick on Suir Bridge

Gabriel Hughes Ire Ltd was the Principal Contractor for the refurbishment of the UB155…

View Project

UB594 Ballysadare Bridge

Principal Contractor for the refurbishment of the Ballysadare Bridge over the Ballysadare River in…

View Project

Perth Bridge, Perth, Scotland

GABE were contracted directly by Perth and Kinross Council to undertake major remedial works…

View Project